Giving a contractor the building’s regular entry code is convenient until the work ends. The code may still be in use, and changing it can mean notifying everyone else who relies on it.
For commercial buildings and condos, temporary access is easier to manage when it has an agreed end date and someone responsible for removing it. The available options depend on the installed access control system.
Decide which doors the contractor needs
Before issuing a card, fob or code, confirm where the work is taking place and how the contractor will reach it.
Someone repairing equipment in a tenant’s suite may need the main entrance and access to that floor. Parking, storage rooms and other tenants’ areas should remain outside their permissions unless the work requires them.
Ask who will attend, including subcontractors. Confirm the working hours with the tenant or manager authorizing the job. If workers need an escort into a restricted room, arrange that before they arrive.
These details help avoid last-minute requests that leave reception or security staff deciding who should be allowed inside.
Check what your system can support
Some access control systems allow credentials to be restricted by door, time or expiry date. Others offer fewer options.
Where possible, issue a credential assigned to an individual. That makes it easier to remove their access without affecting other users. A shared code can be passed along, and its entry record does not tell you which person used it.
Confirm how expiry works on your equipment. If access must be removed manually, assign that task to a named staff member and record the date.
Even an individual credential has limits: its use does not prove who carried it or whether someone else followed through the entrance.
When the work runs late
A job scheduled for Tuesday may carry into Wednesday. Materials arrive late, extra work is approved or a different crew returns to finish.
Give contractors a contact who can handle those changes. The person approving an extension should confirm the new dates, hours and workers attending. Keep the original door restrictions unless the revised work requires different access.
Avoid turning a short extension into unrestricted entry with no end date.
Plan for deliveries and equipment movement
Ask about large deliveries before work begins. Contractors may need a wider opening or supervised access through another entrance.
Leaving a controlled door propped open creates a separate problem that credential restrictions cannot solve. Agree on how the delivery will be handled and who will confirm that the entrance is secured afterward.
If the door needs pulling shut or will not latch after use, have the door hardware and locking arrangement checked.
Close the access when the job closes
Include access removal in the job’s completion process. Confirm that no return visit is outstanding, remove unnecessary permissions and recover issued cards or fobs.
Record anything that was not returned and disable it where the system permits. If a permanent shared code was disclosed, review whether it needs changing and coordinate that change with affected users.
A periodic access control audit can uncover forgotten credentials. It is still better to remove them when each job finishes.